This table provides examples of typical circuits for measuring the various timing situations and their associated timing characteristics. Ton/Toff time is defined as the time required to connect/disconnect the input to output, measured with respect to digital input control signal (gate control). T-break-before-make is the elapsed time between the opening of one switch channel and the closing of another switch channel. T-make-before-break is the elapsed time between the closing of one switch channel and the opening of another switch channel.
 
                 
                 
                 
 
 
 
 Settings
        Settings
     Fast Delivery
                                    Fast Delivery
                                 Free Shipping
                                    Free Shipping
                                 Incoterms
                                    Incoterms
                                 Payment Types
                                    Payment Types
                                





 Marketplace Product
                                    Marketplace Product
                                 
             
                     
                                 
                                 
                                 
                         
                                 
                                 
                                 
                                 
                                 
                                 
                                 Taiwan
Taiwan